A development study is not a sheet that says a project works. It is a document that shows a lender’s credit team the numbers can hold under stress. That gap is why sound projects still get declined, and why developers who know what lenders want move faster and on better terms.
This guide explains how lenders judge a development feasibility study, the ratios they run, the stress tests they apply, and the errors that can kill a deal in credit review. It also shows how a lender’s commercial construction loan team reads a development feasibility report.
What Goes Into a Development Finance Feasibility
The development feasibility model is the proof of concept for the site. It should show, from first principles and with evidence, that the project earns enough to justify the lending risk. The inputs fall into two groups: revenue and cost.
Revenue Side
Gross Realisable Value (GRV) is the total revenue if every lot or unit sells at the current market price.
That current market point matters. Lenders use a cautious open market valuation. They care about today’s price evidence, not the top of the market or the seller’s asking price.
Your GRV should be backed by recent comparable sales, generally within the last six months and within a radius you can defend for that product and location. Agent appraisals can add context, but they are not credit evidence. An independent valuation or a QS-backed comparable set is what lenders accept.
Sales absorption rate, meaning how many units per month the project can really sell, feeds straight into holding cost. A too-fast absorption rate cuts holding cost on paper and can greatly lift the net return. Lenders and their QS teams benchmark it against sales rates from similar projects in the area.
Cost Side
Land acquisition cost includes the purchase price and the related purchase costs: stamp duty, legal fees, and settlement adjustments. For ACT sites, add lease preparation costs and any lease variation charge.
Construction cost is the hard cost of the build. It should be backed by a quantity surveyor’s estimate or a builder’s contract, not a rule-of-thumb rate per square metre. Lenders will appoint their own QS, and if your construction cost estimate is much lower than theirs, the loan proceeds will come down to match.
Soft costs and consultants cover architects, engineers, town planners, certifiers, and body corporate setup. These are often too low in first-pass models, but they are fixed costs in any project.
Finance costs cover interest during construction, line fees, establishment fees, and any mezzanine cost. If a development feasibility model leaves these out, it is not a real study. It is only a return guess.
Marketing, sales commissions, and legal costs usually run at 2–4% of GRV, depending on the product and sales plan.
Contingency is the buffer for cost overruns. Lenders like to see 5–10% of hard construction cost, sized to the risk in the build.
Developer overhead and profit is the return for time, equity, and risk. It is not the same as net profit. It belongs in total development cost.
The Ratios Lenders Run
Once the revenue and cost numbers are in place, lenders test the project with a small set of ratios. Figures are illustrative and subject to lender assessment.
- Profit on Cost — net profit ÷ total development cost. Minimum 20%, preferred 25%+.
- Profit on GRV — net profit ÷ GRV. Minimum 15%, preferred 18%+.
- LVR on GRV — peak debt ÷ GRV. Usually capped at 65–70%.
- Lend-to-TDC — peak debt ÷ total development cost. Usually capped at 70–85%.
These ratios work together. A project can pass one test and fail another. Peak debt LVR on GRV gets most of the focus, because it drives the loan size. But lend-to-TDC often sets the real limit, especially on inner-Canberra sites where land cost takes a large share of value.
The Stress Tests Lenders Apply
A base case is not enough. Lenders test the downside to see how much room the project has before it stops repaying debt.
GRV Softening
What happens to profit on cost if GRV falls 10%, 15%, or 20%? In markets where prices have moved a lot, and the ACT has seen both strong upswings and pullbacks in recent years, lenders want to know how far revenue can fall before equity is hurt. A project that drops from 22% profit on cost to below 10% after a 10% GRV cut is a much weaker credit than one that stays above 15%.
Construction Cost Overrun
What happens if hard costs run 10–15% over budget? Cost growth has been a normal feature of the Australian market since 2021. Contingency is the first buffer. The stress test shows whether the project still works after that buffer is used.
Delayed Programme
Six more months of holding time adds finance cost while your capital stays locked in the site. On a 12-month build at an 8% blended cost of capital, a six-month delay can add about 4% of peak debt in extra interest. On a $10 million facility, that is about $400,000. Figures are illustrative and deal-dependent.
Presale Shortfall
What if you reach practical completion with 25% of units unsold? Lenders look at residual stock risk, but the development feasibility still has to show that the debt can be serviced or cleared if sales take longer than planned.
Common Feasibility Mistakes That Kill Deals
These are the errors we see most when developers bring us studies that have already been to a lender and been knocked back.
Optimistic GRV Not Backed by Evidence
Using the highest sales from the top of the market, or relying on agent appraisals instead of recent sales. The lender’s valuer will use a cautious open market valuation. If your GRV is 10% above their number, your profit on cost, LVR, and lend-to-TDC all move against you at once.
Construction Cost From Guesswork
A per-square-metre rate that has not been checked by a QS or a builder’s quote is weak. Old cost plans, especially ones that are 12–18 months old, are often too low. The lender’s QS will use current rates, and the loan proceeds will be reset against the higher number.
Missing Cost Line Items
Finance costs left out. Marketing and legal costs trimmed too hard. Developer overhead missing. Each one makes the margin look better than it is. When the lender’s credit team rebuilds total development cost with the full line items, the profit on cost can fall below the minimum.
Insufficient Contingency
Three percent contingency on a complex project is not a buffer. It is a wish. The level should match the risk. A simple residential build on a clear site might justify 5%. A brownfield rebuild, a project with heritage issues, or a complex mixed-use job may need 10–12%.
Absorption Rate Not Benchmarked
A sales plan that assumes full pre-sale before construction starts, or instant settlement on completion, needs proof. Lenders will not accept an assumed sales rate without comparable evidence from similar projects nearby.
Building a Feasibility That Works With Lenders
The difference between a study that gets funded and one that fails is rarely the site alone. It is the quality of the evidence and the completeness of the model. Every property development feasibility report should show that the sponsor knows the costs, has stress-tested the numbers, and still has a project worth funding after the cuts lenders will make.
At Black Mountain Financial, we build institutional-grade feasibility models as the first step in our development finance advisory work, before we approach any lender. George Popadalis and the team model your site, product type, planning context, and market data. We run the stress cases first, so we are not finding problems during lender due diligence. We know what a strong development feasibility report looks like from the lender’s side, because we have placed development finance transactions across that table.
If you are preparing a development finance application and want to know whether your feasibility will hold up under credit review, or if you are structuring a new project and want to build the funding model correctly from the start, our development finance advisory process starts there. You can also use our development funding calculator to run early numbers before we speak.
Frequently Asked Questions
Why do lenders care so much about evidence rather than the headline margin?
Because the margin has to hold up under review. A project can look strong if GRV is high, costs are light, absorption is too fast, or finance cost is left out. Credit teams test each input against market data, QS work, builder pricing, and realistic sales timing. They want to know the project still works after they apply cautious cuts.
Which ratio is most likely to limit borrowing?
It depends on the deal, because the ratios interact. Peak debt LVR on GRV often gets the most attention, but lend-to-TDC can be the binding cap, especially where land cost is high relative to end value. A project may pass the GRV LVR test and still be limited by lend-to-TDC.
What evidence should support GRV and construction cost?
GRV should be backed by recent comparable sales, generally from the last six months and within a radius you can defend for that product and location, not by wishful pricing or agent appraisals alone. Construction cost should be backed by a QS estimate or a builder’s quote or indicative pricing. Lenders often use their own valuer and QS, so weak or old assumptions are likely to be adjusted.
Why are stress tests needed if the base case meets the hurdles?
Because the base case is only one view. Stress tests show how much room the project has if revenue drops, costs run over, the programme slips, or sales are slower than planned. A deal that passes in the base case but fails after a small shock may still be too fragile for credit.
What are the most common errors that cause a development finance application to fail?
The most common issues are high GRV assumptions, guesswork on construction cost, missing cost items, weak contingency, and untested absorption rates. Each one makes the project look stronger than it is. When the lender rebuilds the model with current costs and realistic timing, the profit can fall below the line.